Road construction crews continue work on the new interchange at Hallsboro Road and U.S. 74-76. The $9.4 million project, which began in the summer of 2018, includes a bridge that carries Hallsboro Road traffic over the highway, as well as ramps allowing traffic to enter the highway without stopping. The interchange is intended to improve safety by decreasing the chance of crashes. The N.C. Department of Transportation says the project may be open by the end of May.